GTAT’s Merlin Pilot Lines and High Production Machines being built in San Jose

Posted: May 6, 2014 by mattmargolis24 in Uncategorized
Tags: , , , ,

by Matt Margolis

I’ve been asked by a few people what is going on inside GT’s San Jose office?  As it turns San Jose is currently the location that is designing and building the Merlin pilot line along with the building of high volume production machines.  According to a few employee profiles on Linkedin, GT has been on designing and building the Merlin pilot since late 2013.  GT indicated in March that the company planned to have the Merlin Pilot line operational and engage early customers in the 2H’13 and commercially ready by 2015.

I have no update against GT’s expected date but it does look the Merlin operation is up and running.

 

 

GT Merlin Jobs Located in San Jose, CA

ImageImage

 

March 2014 Technology Presentation

Image

Full Disclosure: I am long GTAT and I hope Merlin is magical as it seems

Advertisements
Comments
  1. gtatbrat says:

    Good sleuthing Matt. Congrats on passing 100,000 hits today.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s