by Matt Margolis
Thanks again to my street analyst that provided pictures of the exterior building that were taken this morning on 4/10/14. My street analyst also took pictures on 2/16/14 so I can have some fun comparing the images to show the significant progress that has been made in just under 2 months.
- Line of solar arrays have been installed on the North-side of the building and you can notice the reflection from the sun on the building all around the 3740 BLD-1 sign
- 2 Huge water storage tanks, massive cooling tower system and large electrical station appear to be completed
- 100 foot long and 75 foot high pile of dirt near the large electrical station is gone since 2/16/14 and the large crane has moved
- On the northwest side of the building there appears to be an extremely large generator along with some piping that goes into the building and directly into the ground.
- The parking lot was full and trucks and golf carts were racing around the building hurrying to get work done.
- The city of Mesa is in the progress of expanding the main roads leading up to the plant from 2 lanes across to 4 lanes across.
- A significant amount of large spools of electrical cable that were partially used were seen on the ground outside of the building.
- The north side of the building seems almost complete as it has been landscaped.
Below are the 2/16/14 and the 4/10/14 images of the West Exposure as well as the closeup of the electrical station that is between the crane and the water towers in the 4/10/14 image
Electrical Station 4/10/14
4/10/14 West Exposure Electrical Station, Cooling Tower System and Water Storage Towers
-
White long building is new and has been completed since 2/16/14 just under crane
-
Black structure to the right of water storage power has been completed
-
Electrical Station has been completed
-
Piping connected to water storage for cooling system is now complete
2/16/14 West Exposure Electrical Station, Cooling Tower System and Water Storage Towers
-
Incomplete electrical station
-
Incomplete piping from water storage towers
-
Massive 100 foot long and 75 foot high dirt pile
-
Crane outside of water towers has now moved
-
Next to water storage (right) is another structure which is incomplete but has been completed on 4/10/14 photo
Solar Arrays Installed on North Side (notice reflection on building and solar arrays up close to building
Northwest Exposure – Large Generator and Piping Entering Building and connected to the ground
Northern Exposure Looking Complete on 4/10/14
2/16/14 (Left) versus 4/10/14 (Right)
Parking lot looking Full on 4/10/14.
2/16/14 (Left) versus 4/10/14 (Right)
Extra Electric Cables Everywhere and large piping (4/10/14)
West Side Rock Truck Frenzy (4/10/14)
Elliot Road Landscaping Looking Complete (4/10/14)
Fascinating pictures! In your opinion is this plant actually making any finished product yet? and if ‘no’ does that suggest a Sept release of any Apple product with sapphire?
Also, there are rumors that the new Ipad will have touch ID. Doesn’t that suggest it will have a sapphire screen cover too?
LikeLike
They are definitely making a lot of sapphire right now. I think module 1-4 are producing and mod 5 is being finalized. They should be fully ramped up by end of month or May the latest. I would be surprised if we have to wait until Sep for the 4.7″ sapphire covered iPhone.
LikeLike
Matt, when do you expect 4.7″ sapphire covered iPhone then ?
LikeLike
I believe we could see it as early as late June after the WWDC. I’m going to dig into the supplier ramp ups but I see no reason why the phone could not come out in late June.
LikeLike
Glad to hear that, Matt.
I also think there is still possibility that we may hear iPhone 6 w/ Sapphire during WWDC even though fall release may be more probable. I’m keeping my fingers crossed for summer release.
LikeLike
I have an idea about the WWDC and most people have ignored what seems obvious.
LikeLike
Do you mean the WWDC 2014 logo that obviously looks like solar cells?
LikeLike
Ummm yaaaa !
LikeLike
Some smart guy saw the solar cells in the logo and many ppl agree on that interpretation. I’m one of them. No doubt that iPhone w/ Sapphire and solar cells will come eventually. I just hope it comes at WWDC
LikeLike
Just posted an article on this
LikeLike
June should be a five star month.
LikeLike
[…] Mesa Sapphire Plant Images – Cooling system, Electrical Station, Solar Arrays, Water Storage a… […]
LikeLike
[…] Mesa Sapphire Plant Images – Cooling system, Electrical Station, Solar Arrays, Water Storage a… […]
LikeLike