Mesa Sapphire Plant Structure Activity – Sneak Peak

Posted: April 9, 2014 by mattmargolis24 in Mesa Sapphire Plant, Uncategorized
Tags: , , , , ,

A complete breakdown will come later but here is a sneak peak detailing some of the Mesa sapphire plant activity. Heat exchangers, cooling towers, associate piping and electrical, fan coil units, new exhaust for the UPS and battery rooms. Lighting for north and south end house and pump.

ELEC BLDG NORTH 3600 SF
ELEC BLDG SOUTH 1440 SF
PUMP HOUSE 2000 sf

BLD2014-01287 ADDENDA TO PACKAGE A02K – DRB016. REF BLD2014-00440. WORK IN CENTRAL UTILITY PLANT INCLUDING HEAT EXCHANGERS, COOLING TOWERS, AND ASSOCIATED PIPING AND ELECTRICAL FOR ADDITIONAL FAN COIL UNITS, I AND C POINTS FOR THE CENTRAL PLANT AND NEW EXHAUST FANS FOR THE UPS AND BATTERY ROOMS. LIGHTING FOR N AND S E-HOUSE AND PUMP HOUSE ALSO INCLUDED.

Exterior bldgs

BLD2014-00391 PACKAGE – NORTH ELECTRIC BUILDING. JOB #14-B-35380. BUILDING IS A 3600 SQ FT, F-1 OCCUPANCY, TYPE IIB CONSTRUCTION, FIRE SPRINKLERS. 3
BLD2014-00397 PACKAGE FOR E HOUSE SOUTH BUILDING. STEEL BUILDING, 1440 SQ FT, F-1 OCCUPANCY, CONSTRUCTION TYPE IIB. 3
BLD2014-00399 DESIGN PACKAGE – PUMP HOUSE BULDING, A 2000 SQ FT, F-1 OCCUPANCY, TYPE IIB CONSTRUCTION, SPRINKLERED BLDG.

PLN2013-00416 LAND SPLIT APPLICATION REC
DOC2013-00270 COPY OF ZONING CASE FILE Z11-012

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s